From: route@monster.com
Sent: Saturday, April 16, 2016 2:05 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
RESUMÉ FOR: ANTHONY JOHN BESTER 2613 Jackson Drive Lewisville, TX
75067 Mobile:(214)
864-6190 mailto:ajb1957@gmail.com EXPERIENCE 40 years’
experience in Telecommunications, Site Construction, Site Engineering, Site
build, Quality, Implementation, Deployment, Site Engineering, DC Power Backup
Systems, Battery with PDU and Rectifier Implementation, Testing,
Commissioning, Integrating and Troubleshooting, Managing Tower and Ground
Crews. January 2015
– December 2015:Ericsson US – Construction
Manager II (AT&T Turf Team) Construction
Manager Responsibilities: Assess and control
charges to the agreed site design. Ensure only
customer's approved materials are installed on the project Agreed Civil Works
guidelines and schedules are followed and enforced. Awareness and
on-site supervision during where risk of disturbances in customer site
performance is high. Check that the
working environment is maintained at an acceptable level, carry out safety
inspections and ensure that tools, etc. are in good working condition. Civil Works problem
solving as required during the project. Coordinates site
activities and assures that all disciplines directly involved in the project
are in phase with the Project goals and objectives. Drive schedule
activities and trouble-shooting results. Ensure that Service
Providers and vendors/suppliers meet all the technical specifications with
respect to E/// and customer specifications. Ensure workmanship
quality of the installations done by the Service Providers is within the
Contract, Ericsson standards and Customer expectations. Ensure all
Ericsson, Federal, Local, and customer safety guidelines and construction
procedures are enforced during the entire Civil Works phase of the project. Performed
the following tasks: Site
pre-inspections and coordinate post-construction audits. Site verification. Visual inspection
of quality on site. Prepared regular
interval progress reports as required by the project Provided accurate
status information on the progress to project management. Provided technical
assistance to the Service Providers and any other suppliers that provide
services associated with the Civil Works activities. Reject wrong
deliveries of material to site. Report bad
performance and quality on site. Responsible for the
proper interpretation and compliance of the civil design plans. Supervise,
coordinate and monitor works with the Service Providers and other disciplines
that have an interface with the Civil Works part of the project. Team leadership
focusing on quality and results. Write claims, order
and return materials. Maintain and update
construction-specific areas of Site Handler including but not limited to the
following: SOW and preconstruction documents (NTP, SOW, RFDS, safety
guidance, QA standards, etc.) NTP receipt
verification RFDS submission
review and changes Civils acceptance
documents, submission receipt, review and approval Civils progress PFA
verification (daily) Close out document
review and acceptance sign off December
2012 – May 2014:Ericsson US – Implementation Manager II (Sprint SNV) Implementation
Manager Responsibilities: Coordinate
Equipment deployment & integration. Manage market level
BTS cabinet(s) deployment. Submit Q-Track
request to order integration scripts, REACT request to order license keys,
submit sites for integration on scheduling tool. Coordination with
Tactical team and managing latest MOPs, Go-No-Go calls with ASPs/SPs for
Field Engineering services to Install and integrate the cabinets,
coordination and submittal of MOP documents. Network equipment
deployment problem solving. Ensure that the
agreed implementation schedules and guidelines are followed and enforced. Submits regular
daily/weekly/monthly progress data to the Market Leads, customer project
managers. Attend internal
coordination and progress meetings, providing updates as needed. Coordinates
activities and ensure that all disciplines directly involved in the project
are in line with the Project goals and objectives. Responsible to
maintain on a daily basis all project milestone data in the tool of record. 1996 – June
2012:Nokia Siemens Networks (Previously Siemens) -
Senior Engineer, Site Implementation Management, Engineering & Quality
Assurance Managing
Implementation and Site Engineering: LTE, UMTS, MME,
SGW, NDS, PGW, HSS, RNC, SGSM, GSM, BSC, Transcoder, BTS Flexi, BTSE, MSC,
BSS, MSC / Base Station PDU, Rectifiers with Battery Backup Installation,
Site Build and Special Services. Quality Auditing
for Implementation and Site Engineering: LTE, UMTS, MME,
SGW, NDS, PGW, HSS, RNC, SGSM, GSM, BSC, Transcoder, BTS Flexi, BTSE, MSC,
BSS, Site Build and BSS, MSC / Base Station PDU, Rectifiers with Battery
Backup Installation. MSC / Base Station
PDU Installation Battery Backup
Installation Manage FSI Quality
Audits Operation &
Maintenance HW / FW / SW Upgrades HW / FW / SW
Inventory Record Keeping Upgrade Service 911 Emergency
Service Analyze Field
Problems and Recommend Course of Corrective Action. Develop, Test and
Review Detailed Step-By-Step Procedures Related to Installation and or
Upgrades (MOPS) Develop, Test and
Review Detailed Step-By-Step Procedures Related to Installation and/or
Upgrades of 3rd Party Rectifiers, Battery and Power Distribution Units
(Purcell / Emerson Backup Power / Rectifiers) 1996 -1996:Samsung USA Deerfield Beach, Florida - Customer Service Engineer TAC 3, Samsung
Digital Key Systems. (DCS, DCSC, 408/612/816, 1224 Hybrid, 56ex/120mx and
Starmail) 1990 - 1994:Plessey Tellumat SA Jet Park, South Africa Senior Product Specialist
Customer Service Manager. Program and Tested
PBX Systems. Evaluate all Field
Trails of New Software Versions. Provided Product
Support to Field Technicians and Customers. Responsible for
Technician Training. 1974 - 1990:Department Of Telecom Namibia, Namibia -Telecom Control Supervisor. Supervisor of
Training, Planning, Cost Estimating, Stock Control and Customer Service. Test and Program
Pre- Payment Coin Phone Software. Evaluate Field
Trails of Coin Phone Models. Program Software
for Field Programming Units SKILLS LEVEL Skill Name:Implementation
/Construction Manager: - Knowledge of the
following products- LTE, UMTS, MME,
SGW, NDS, PGW, HSS, RNC, SGSM, GSM, BSC, Transcoder, BTS Flexi, BTSE, MSC,
BSS, BSS, MSC / Base Station PDU with Battery Backup Installation, Site Build
and Special Services. AXE 501, AXE 810 3G
UMTS, Power PDU, and EPDU. BTS 2100 series, UMTS Node B 3100 series cabinets,
BBU power, eNodeB B 6000 series, RRU/RRUW, DUG/DUW/DUL, Air Antenna, Metro
Cell, RET/CCU Microsoft Office
Applications Understanding of
Core network connectivity- MSN, BSS, RNC,
MME/SGSN, SGW/GGSN, DAX- OC3 and RAN network connectivity- EBH, T1/ NIU to
transport DAX, ETTCS, SIAD, Ciena, & Microwave backhaul. Quality Assurance:
- LTE, UMTS, MME,
SGW, NDS, PGW, HSS, RNC, SGSM, GSM, BSC, Transcoder, BTS Flexi, BTSE, MSC,
BSS, MSC / Base Station PDU with Battery Backup Installation. Manage Quality
Audit Program Manage and train
FSQ Auditors. Channels Quality
reports directly to Senior Management. Single point of
contact between Global and the US market for addressing Installation
Equipment Quality issues. Define processes
required for internal and external quality processes. Ensure equipment is
installed to Customers requirements, Standards and defect free. Work closely with
the Customer to address and resolve Customer Quality concerns. Ensure the Field
Service personal are informed of all Customer Quality Requirements. Establishing,
controlling and maintaining all quality records for the Field Service Quality
Program. Monitor, control
and certify the Contractors Installation quality program. Ensure the
contractor has the appropriate training, documentation, Quality Checklist and
tools to Adequately do the
installation. Validate the FSQ
audits (job close-out papers). Oversee the first
installation performed in the market by the contractor. Submit Installation
Contractor documented written Site Quality Installation Audit reports after Installation start. Point of contact
for the FSQA for reporting and addressing all Installation defective damaged Equipment and
accidents. Be the point of
contact and create a weekly dialog with the Contractor Installation Address quality
issues/concerns, site audit report corrective action. Ensure all audits
are turned over defect free (all Quality Audit reports are closed, no open
items). Ensure ISO
requirements are in effect and being followed. Maintain the site
audit database and provide regular quality reports. Submit weekly
report of activity (# audits performed, new or open Quality concerns and Issues in region,
common defect list). Implementation
Support (Installation, Commissioning, Acceptance & Integration) Responsible for
managing the first level of escalation from the field and manage these
escalations through resolution. Act on behalf of
the field staff to ensure all items, which impede the progress of the
projects, are Removed and
appropriate corrective action measures are initiated. Work very closely
with other departments, represent field on isolated, as well as generic
issues, which Impede schedule completion or impact cost objectives. Self-motivated and
able to optimally prioritize tasks to ensure department objectives are met. Product Line
Modifications, Engineering, Upgrades and Special Equipment Development Maintain close
relationship with Global based PLM (Product Line Management) Team. Support Global
based PLM team in World Market and US Market. Write procedures
for HW modifications & upgrades World Market and US Market. Develop &
engineer external cabinets, to house radio equipment and Backup Power
(Purcell & Emerson Cabinets). Develop procedures
for special one-time modifications. Engineer Cell Sites. Enable Network
Implementation resources to perform modifications and upgrades. Methods of
Procedures Develop, test, and
review detailed step-by-step procedures related to installation and or
upgrades. Conduct MOP review
meetings internal and externally with customers. Coordinate
activities associated with specific upgrades. Provide on-site or
telephone technical support, as well as Remote Testing assistance. Enabling of
internal/external project resources. Engineering
Standards, Site Survey and Engineering Support of
Engineering Standards and Site Engineering teams. Conduct technical
discussions with customers and other departments concerning engineering
issues. Exchange and share
information with peers, both within and outside of functional area. Interface with
Engineering Standards to identify discrepancies and additional requirements
relative to The production of
the equipment specification. TAC (Technical
Assistance Center) Provide Field
Implementation group and customers with immediate assistance and resolution
of Technical problems. Recommendations and
follow through for improvements in product design and quality. Provide instruction
and technical supervision to Field Implementation group and customer
personnel as required for all facets of product installation, performance,
maintenance, troubleshooting and Upgrades. Participate in
internal review and make recommendations associated with product
documentation or equipment performance. Recommend, develop
and document processes, procedures and programs necessary to make Modifications to or
retrofit products currently deployed in the field. This includes both
products Reliability and
quality issues. Investigate
customer complaints and work with the necessary internal organizations in
developing and implementing corrective action. EDUCATION 1974 Graduate
Walvis Bay High 1976
– 1979 Telecommunications
Technical College Namibia Associates. 1996
- Present Siemens
& Nokia Equipment Training Facilities, Munich and US. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
Afrikaans |
Fluent |
|
|
English |
Fluent |
|
|
German |
Intermediate |
|
|
|